Radhi Small Hydro Power Project

Installed Capacity:
4.4 MW

Tallo Khare Khola Hydro Power Project

Installed Capacity:
11 MW

Syange Hydro Power Project

Installed Capacity:
183KW

Syange Mini Hydropower Project

Syange Mini Hydropower project which is located in Taghring VDC in the northern part of Lamjung District, has an installed capacity of 183 KW capacity and was completed in  2001 (2058 B.S). This project supplies power to Nepal Electricity Authority (NEA) through the national grid with inter-connection to the Udipur Substation of NEA. The project has already repaid its loan in February 2011. Syange Bidyut Company Limited, which has developed and is currently operating this project, is a subsidiary of CEDB Hydro Fund Limited

The main features of Syange Mini Hydropower Project are:

Installed Capacity

183KW

Design Flow

570l/s

Gross Head

46 m

Total Energy

1,191,429 KWh

Dry Season

292,484 KWh

Wet Season

898,945 KWh

Project Cost

NRs. 24 million

 

 

 