Radhi Small Hydro Power Project

Installed Capacity:
4.4 MW

Tallo Khare Khola Hydro Power Project

Installed Capacity:
11 MW

Syange Hydro Power Project

Installed Capacity:
183KW

News & Events

Amendment to MoA/AoA

April 27, 2018

Amendment to MoA/AoA; download file:

Back ยป 

© CEDB Hydro Fund Limited. All Rights Reserved.
Site by: